Skip navigation

Question 06

Examine the text below and drag and drop 5 answer tiles into the correct gaps.

Quality Assurance personnel should prepare and a statement to be included in the which specifies types of and their dates, including the of the study inspected and the dates the inspections were reported to and the Study Director.

management
sign
phase
inspections
final report